美国,纽约,911博物馆方案/craig dykers,snohetta

9月11日恐怖袭击双塔七年后的原址已经被清理成一个纪念世界贸易中心的博物馆的基地。建筑师craig dykers和他的snohetta设计公司的方案将合并原来的塔的基地。在博物馆的中心位置保留两个三叉戟异型柱。6层高的建筑将用于公共内容的活动和博物馆功能,机械和通风设备将服务于地下博物馆和世界贸易中心附近的交通枢纽。底楼将包含楼梯、自动扶梯和电梯引导游客进入街道平面70英尺以下的纪念广场。博物馆的外墙包有金属板。它预计将耗资8000万美元,并将在2012年开放。

原文:http://www.designboom.com/weblog/cat/9/view/3890/plans-for-911-museum-by-craig-dykers-and-snohetta-firm.html

seven years after the 9/11 twin towers terrorist attacks plans have been released for a museum building for

the world trade centre site. architect craig dykers and his snohetta firm have combined the old with new using

parts from the original towers. two trident shaped columns that survived the attacks will be located in the atrium

of the museum pavillion. standing at approximately six storey's high the building will contain areas devoted to

public programs and museum functions, as well as an area for mechanical and ventilation equipment that will

service both the underground museum and nearby world trade centre transportation hub. the ground floor will

contain staircases, escalators and elevators leading visitors 70 feet below street level to the memorial plaza.

the museum's exterior will be clad with metal panels. it is expected to cost 80 million USD and will open in 2012.

版权: 翻译 www.ArchGo.com

(点击此处下载所有大图 1.3 M)